Yoshitake

Corporate Information

Environmental Activity

Environmental Activity-YOSHITAKE WORKS(THAILAND) LTD.

Solar Photovoltaics

YOSHITAKE WORKS (THAILAND) LTD., the main factory of Yoshitake Group, installed the 1st phase mega solar power system from March 2018. In July 2023, it installed the 2nd phase mega solar system, and is now equipped with 2 mega solar power systems. The system has the capacity to supply about one-third of the total daily power consumption of the entire factory, and contributes to environmental protection through the use of renewable energy.
In addition, the system has a power storage function and is used as a backup power source to support the stable operation of the factory.

Solar System

*Total as of 10/4/2024

Today Energy

3.01 MWh

Monthly Energy

11.55 MWh

Energy Yield

8.16 GWh

CO2Avoided

6.09 Kt

Solar Photovoltaics -- Annual Operation Results --

graph

Digital Catalog

Learn More